Suspended carriage for wind energy facility, rotary connecting device for wind egergy facility, wind egergy facility, driving method for wind egergy facility.
风能设施的吊厢,风能设施的旋转连接器,风能设施,风能设施的驱动方法。
Gamesa's Fairless Hills wind-energy turbine manufacturing facility employs approximately 300 workers and was built at a former U. S. Steel industrial site.
盖姆沙工厂的风能涡轮制造厂雇佣了大约300名工人,这家工厂的前身是一家钢铁工厂。
The layout of developing the large dimension wind tunnel, high Reynolds number wind tunnel, high-energy facility, will improve the simulative ability of wind tunnel and enhance the testing level.
规划中大尺寸风洞、高雷诺数风洞、高能量气动设备的研制,将使风洞模拟能力和测试水平实现新的飞跃。
应用推荐