The wave force on the steel-pipe pile which was connected and unconnected to the test platform was tested; and the acceleration versus time data and natural vibration frequency were obtained.
对波流力作用下连接及未连接平台的钢管桩进行了测试,获得了加速度时程曲线以及钢管桩固有频率。
PHC pipe pile plank in end is usually produced by cutting steel plank or forging, and then machining.
PH C管桩端板的通常生产方法是采用钢板切割或锻打成型,然后机加工而成。
Using the method of top pressure and out soil promoted a comprehensive rectifying deviation to the structure, and using of steel pipe pile method reinforced the base of the tower.
建于深厚软土上的某铁塔因基础周边不均匀填土后产生了严重的不均匀沉降,经采用顶压法和掏土法对构筑物进行综合促沉纠偏,同时采用钢管桩法加固处理,实践表明效果良好。
应用推荐