The pile-end post-grouting technology can increase the bearing capacity of piles and improve the bearing performance of piles.
桩端后压浆可以提高桩的承载力,改善桩的承载性状。
Problem on the bearing capacity of cast-in-place pile influenced by the deposit at pile end and the mud hanged on pile shaft can be solved by the technique with the post grouting.
灌注桩后压浆技术解决了桩底沉淤和桩身泥皮影响灌注桩承载力的问题,使桩底、桩侧土得到了加固,从而大幅度提高了灌注桩的承载力,降低了桩的沉降量。
The tests show that the longer the age of bored piles, the higher the opening pressure of pile end post grouting. However, the age of bored piles has little influence on the final grouting pressure.
注浆试验表明:随着成桩龄期的增加,开塞压力也相应增大,但成桩龄期对终注压力影响不大。
应用推荐