低估
大多数新玩家大体上低估(Underestimate)在特定的限制桌玩比较长的的一个时间段所需的资金。灵魂在耕耘中净化,信念在耕耘中升腾。
看轻
...巴如许的世界级球星压阵(Hold the line),在小组赛开打前媒体预测非洲球队能够过关的候选队伍中加纳队也是被看轻(Underestimate)的一支。不要浪费你的生命在你一定会后悔的地方。
小瞧
...月风雨(Wind and rain),终归拨云见日后,能对阿布(Abu)是个指挥,也对老穆是个警示 -----阿布(Abu)你必要太 小瞧 ( Underestimate )这位 切尔西(Chelsea)的教父,更必要认为自身有钱就可以把意志高出在所有人的意志之上, 切尔西(Chelsea)是你的,但要想开展下去你...
被低估
股市中有许多板块,但股价却参差不齐,因此我们可通过同类各项指标的比较,定会发现一些价值在同类中被低估(Underestimate)的股票,这种低估是暂时的,日后定会有补涨行情。所以,在被低估时积极吸纳,不失为一种较好的投机方式。
低估;看轻
A cost overrun, also known as a cost increase or budget overrun, involves unexpected costs incurred in excess of budgeted amounts due to an underestimation of the actual cost during budgeting. Cost overrun should be distinguished from cost escalation, which is used to express an anticipated growth in a budgeted cost due to factors such as inflation.Cost overrun is common in infrastructure, building, and technology projects. For IT projects, a 2004 industry study by the Standish Group found an average cost overrun of 43 percent; 71 percent of projects came in over budget, exceeded time estimates, and had estimated too narrow a scope; and total waste was estimated at $55 billion per year in the US alone.Many major construction projects have incurred cost overruns; cost estimates used to decide whether important transportation infrastructure should be built can mislead grossly and systematically.