Problem on the bearing capacity of cast-in-place pile influenced by the deposit at pile end and the mud hanged on pile shaft can be solved by the technique with the post grouting.
2
另一部分沉出淤渣的清澈磷酸经浓缩后再中和制磷酸二铵。
Another part of limpid phosphoric acid after removing subsiding sludge was concentrated and neutralized to produce granular DAP.
3
当沉沙池淤满,失去自流沉沙作用时,采用“以挖待沉”可以延长灌区运行年限,但没有扬水沉沙方案优越。
When sand sinking pools are full and lose efficacy, the method of "digging out sands to wait for deposition" can increase the life of irrigation region.