In this paper, the problems on best optimum design of GPS Engineering control network are discussed.
2
结合重力测量,介绍利用GPS技术进行东海大桥跨海工程控制网的布设技术方案。
With reference to the gravity survey, this paper describes the schemes of control network layout used with global positioning system (GPS) technique for Donghai Bridge project over sea.
3
但不同意按工程控制间距的网度系数直接折算各个级别储量勘查成本费用。
But he disagrees with the method of directly assessing the costs according to the coefficients of the controlled distances in exploration engineering.