It presents the computation models of different construction conditions, based on construction sequence and technologies.
根据施工顺序和施工工艺,确定不同工况下计算模型。
Based on analysis on the two aspects as construction sequence and proper distance, the practical construction scheme is optimized.
从施工顺序和合理间距两方面进行数值分析,从而使得实际隧道施工方案得到优化。
Finally, through the pilot the paper analyzed the construction sequence of the CRCP and its end fixing equipment, and the corresponding quality checking standards.
最后,论文通过实体试验段工程分析了隧道内连续配筋混凝土路面板及其端部锚固的施工工艺及组织顺序,并给出了相应的质量检验标准。
The project completion probability is discussed, which fully describes the uncertainty of construction sequence schedule and provides basis for analysis of time limit.
进行了完工概率分析,较好地描述了施工进度计划的不确定性,为施工工期论证分析提供了依据。
Based on the cost analysis of typical projects, this paper puts forward matters of attention concerning construction sequence and engineering design of inland navigation projects.
选择部分典型工程进行造价分析,提出内河航运工程在建设时序上及工程设计中值得考虑的问题。
Arup are to specify that the contractor is to reevaluate all element forces in the case that the specified construction sequence assumptions are exceeded.
奥雅纳将要求在既定施工程序改变后,承包商会对构件内力作重新计算。
Firstly, an appropriate mechanical model considering the stress relief and the installation sequence of the lining is proposed to model the construction sequence of the tunnel structure.
考虑地应力的释放和衬砌安装的时序,提出合理模拟隧洞修筑过程的力学模型。
Firstly, an appropriate mechanical model considering the stress relief and the installation sequence of the lining is proposed to model the construction sequence of the tunnel structure.
考虑地应力的释放和衬砌安装的时序,提出合理模拟隧洞修筑过程的力学模型。
应用推荐