In Marine and Ocean engineering area, the performance prediction is very important, and model test is an efficient method to carry out this prediction.
在舰船及海洋工程领域里,性能预报是非常重要的,而模型试验是完成这种预报的一种有效方法。
Laboratory physical model test is an important approach for study on stability and failure mechanics of slopes.
室内物理模型试验方法是进行边坡稳定性和破坏机理研究的重要方法。
After investigation, analysis, model test and engineering practice, a new construction method on building dam is proposed.
经调查研究、观测分析、模型试验和工程实践,形成一套新的堤坝快速构筑施工方法与工艺。
Dynamic model test of overflow dam section of Three Gorges Project was carried out on a large-scale vibration actuating system.
利用大型三向六自由度地震模拟振动台,对我国三峡工程溢流坝段进行了动力模型试验。
The method presented is verified through a model test case.
通过水槽概化模型试验实例,对本方法进行了验证。
The regularity of the results of FEM and model test are same.
有限元分析结果与模型试验结果的规律性是一致的。
The study method is to combine theory calculation with model test.
本文采用理论计算与模型试验相结合的研究方法。
The model test of grabs is important in the development of new grabs.
模型试验是新抓斗研制的一个重要环节。
Satisfactory results were obtained from model test and craft sea trial.
船模试验和实艇试验均得到满意的结果。
With indoor model test, the conclusion of the paper is further verified.
通过室内模型试验,进一步验证了本文结论的正确性。
Up to now, there is no test standard for model test of intake design in our country.
目前我国尚未有关于泵站进水设计模型试验的试验标准。
The similar material model test is one of the rock mechanics basic research approaches.
相似材料模型试验是岩石力学的基本研究方法之一。
The selection of model sand is the key problem in the design of a mobile bed model test.
对于研究泥沙问题的动床模型试验,模型沙的选择是模型设计的关键。
Wave model test of embankment structure is one of the important means of breakwater design.
围堤结构的波浪模型试验,是围堤设计的重要手段之一。
An indoor model test is carried out on rock mass of cracked structure reinforced by the bolt.
针对锚杆加固后的碎裂结构岩体进行了室内模型试验。
Based on the model test, the regularity of Dongshan coal underground gasification was obtained.
通过地下气化模型试验,获得了东山煤地下气化过程的一般规律。
That will increase the accuracy and efficiency of the model test and the performance prediction.
这将提高模型试验和性能预报的效率和精度。
The water turbine model test for Geheyan Project was performed in 1991, in Lachine, Quebee, Canada.
隔河岩水轮机模型试验1991年在加拿大魁北克拉辛市进行。
Calculated frequencies agree quite well with the results of model test and those of field measurement.
理论计算频率与模型试验结果及现场实测结果较好地符合。
This paper describes the model test for stability of the Changzhao rubble masonry dam with concrete mortar.
本文介绍了长诏水库混凝土砌石坝的稳定性模型试验的情况。
The effect of canvas spreaders on the performance of anchored sow net was studied through model test in tank.
通过对帆式张网模型水池试验,研究了扩张帆布对帆式张网网具性能的影响。
Some problems about the ice model test are also discussed by comparison with the observed data from the prototype.
同时对照了原型观测成果,讨论了冰凌运动模型试验中的一些问题。
In this paper, the results of a segmented elastic-keel model test in both regular and irregular waves are presented.
本文提供了一个分段弹性龙骨船模的试验研究结果,包括规则波和不规则波中的试验。
The stabilized weight of dolos armor block is determined on the basis of sectional model test and overall model test.
在断面模型试验与整体模型试验的基础上,确定了扭工字护面块体的稳定重量。
Comparing the calculation results applying the time domain analysis with model test results shows fairly good results.
应用时域分析的计算结果与模型试验结果进行了比较,获得了比较好的结果。
The model test and the exploration example show that this method can be used to explore ground water in volcanic area.
模型算例和勘探实例表明这一方法可以用于勘探火山岩地区地下水。
The effect of the bottom slope on the rapid flow shock wave is theoretically studied with the relevant model test herein.
通过理论分析研究了底坡对急流冲击波的影响,并进行了相应的模型试验研究。
The phosphorus transport and removal efficiency were analyzed on the basis of bank buffer strips model test in laboratory.
通过模拟试验分析改进后堤岸缓冲带对磷素运移规律及其去除效应的影响。
The estimation formula for slit-type buckets maximal pressure intensity is given through analysis and hydraulic model test.
通过分析研究和水力模型试验,提出了窄缝式挑坎最大动水压强的估算式。
The estimation formula for slit-type buckets maximal pressure intensity is given through analysis and hydraulic model test.
通过分析研究和水力模型试验,提出了窄缝式挑坎最大动水压强的估算式。
应用推荐