• That new construction project is behind schedule and over budget.

    那个新的建筑工程已经进度落后,还超出预算。

    youdao

  • It also discusses how to determine the project cost through analysis and calculation by (utilizing) the existing Budget Quota issued by the Construction Department.

    利用现有部颁预算定额通过分析计算确定钢桥面铺装的工程造价

    youdao

  • Over time, the existing plan was eventually discarded, and the news that another architect was assigned to proceed with the construction project at a half of the budget was heard.

    随着时间推移,我们设计的平面最后放弃了。最近我们听到消息另外一名建筑师被委任推进这个建设项目只有一半的预算

    youdao

  • Establishes the construction drawing budget, definite project construction cost basis.

    编制施工图预算确定工程造价依据

    youdao

  • This paper discusses the effect on Construction Budget Consulting Organization in phase of project construction from four aspects.

    四个方面论述工程造价咨询单位工程项目建设阶段作用

    youdao

  • Express information network construction budget into equipment new project budget and equipment renewal budget.

    快递信息网络建设预算分为设备新建工程预算设备更新换代预算。

    youdao

  • The project design includes structural design, construction organization design and budget making.

    工程设计包括:结构设计、施工组织设计编制预算

    youdao

  • We can edit , print and save engineering budget and budgetary estimate , and maintain various construction project quota by this system.

    我们使用系统方便完成工程概预算文件的编制打印归档保存以及各类建筑定额维护操作。

    youdao

  • Project cost can be effectively controlled from the aspects of implementation, bidding, contract management, material and stuff price, construction supervision and project budget.

    建设实施阶段,建设单位在招投标合同管理材料价格、施工管理(监理)、工程决算等几个方面,加强管理能够有效地控制工程造价

    youdao

  • Ahead construction project proceeding, an accurate budget is the base for an investor to make a correct decision.

    在项目前期准确建设工程预算投资者据以作出正确决策基础

    youdao

  • The establishment, remuneration and the expenses of the staff of the preparation and construction office, when agreed by both parties, shall be covered in the project budget.

    经甲乙双方同意,工程预算包括筹建工厂人员编制报酬费用

    youdao

  • After approved upon by both parties, the establishment, remuneration and the expenses of the staff of the preparation and construction office shall be covered in the project budget.

    筹建处工作人员编制报酬费用甲乙双方同意,列入工程预算

    youdao

  • "Light" construction strategy is a wise choice under tight project schedule and limited budget.

    紧张项目进度有限预算下,“结构策略一个明智的选择

    youdao

  • It's easy for project budget and can save 20% of the total charge compared to flange connecting, the construction don't need the power supply, oxygen, and fire.

    便于工程预算法兰连接节约工程费用地20%,施工无需电源氧气明火

    youdao

  • Now, there are more than 100 staff in the company, and about 80% of them are graduated with such majors as construction, structure, equipment, landscape, interior design, project budget.

    公司目前员工100人,其中建筑结构设备景观室内概算各类专业人员占到80%。

    youdao

  • Now, there are more than 100 staff in the company, and about 80% of them are graduated with such majors as construction, structure, equipment, landscape, interior design, project budget.

    公司目前员工100人,其中建筑结构设备景观室内概算各类专业人员占到80%。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定