• The influence of concrete creep on bridge structure under the construction and operation stage for prestressed concrete continuous rigid frame bridge and cable-stayed bridge is also analyzed.

    本文针对预应力混凝土连续刚构桥斜拉桥分析计算了施工运营阶段,混凝士徐变桥梁结构影响

    youdao

  • The shaking table test was conducted to gain an insight into the earthquake resistant performance of a large-span prestressed concrete grillage girder space frame structure.

    利用地震振动台对大跨预应力混凝土井式空间框架结构抗震性能进行了实验研究。

    youdao

  • The shaking table test has thus been conducted of a large-span prestressed concrete grillage girder frame structure to gain an insight into its earthquake-resistant performance.

    利用模拟地震振动台对这种大跨预应力井式框架结构的抗震性能进行研究。

    youdao

  • The bonded prestressed concrete structural wide flat beams were employed as the frame beams, while the unbonded prestressed concrete structure was applied to the junior beams.

    框架粘结预应力混凝土梁,次梁采用无粘结预应力混凝土结构

    youdao

  • On the basis of structure reliability principles, this essay studies the reliability of prestressed-concrete rigid-frame bridge with high-pier and large-span during construction period.

    本文依据结构可靠理论,对高墩大跨预应力混凝土刚构桥施工期桥墩可靠度进行研究

    youdao

  • On the basis of structure reliability principles, this essay studies the reliability of prestressed-concrete rigid-frame bridge with high-pier and large-span during construction period.

    本文依据结构可靠理论,对高墩大跨预应力混凝土刚构桥施工期桥墩可靠度进行研究

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定