• Considering the thick backfill and soft foundation soil in the cut-and-cover section of Jiadi tunnel, a pile-raft foundation is accepted in order to avoid negative effect due to excessive settlement.

    隧道出口回填厚度较大基础土体软弱,因此采用了桩-筏基础的形式避免过大沉降带来的不利影响

    youdao

  • A settlement computation method to the composite foundation composed of slurry wall-pile-box or thick raft is proposed, which is defined in the paper as two-stage settlement computation method.

    提出地下连续墙--所构成的复合基础沉降计算方法方法定义二阶段沉降计算方法。

    youdao

  • A method is proposed for the settlement and inner force analysis of rigid pile composite foundation raft system.

    提出一种分析刚性复合地基板基础相互作用体系内力变形的实用方法

    youdao

  • Finally, a series of parametric analysis was made to study the settlement of piled raft foundation and the loads Shared by the individual pile and subsoil.

    最后对桩基础沉降桩以及土之间荷载分担情况进行一系列参数分析

    youdao

  • Finally, a series of parametric analysis was made to study the settlement of piled raft foundation and the loads Shared by the individual pile and subsoil.

    最后对桩基础沉降桩以及土之间荷载分担情况进行一系列参数分析

    youdao

$firstVoiceSent
- 来自原声例句
小调查