• A new type of column-RC beam joint of concrete filled steel tube (CFST) is created. The outer tubular column of CFST is disconnected in the joint zone. The core steel tube is put in the joint zone.

    提出种在节点间断钢管混凝土钢管、设置钢管的新型钢管混凝土柱与钢筋混凝土节点

    youdao

  • A new type of column-RC beam joint of concrete filled steel tube (CFST) is created. The outer tubular column of CFST is disconnected in the joint zone. The core steel tube is put in the joint zone.

    提出种在节点间断钢管混凝土钢管、设置钢管的新型钢管混凝土柱与钢筋混凝土节点

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定