• Utilizing the everlasting headframe might effectively cut down the mine building construction period and had beneficial result and economic results.

    利用永久井架凿井可以有效地缩短矿井建设工期。为业主带来良好的社会效益经济效益。

    youdao

  • Optimizing the Construction Organization Planning, Decreasing the Tunes of Uncovering Coal Seam, Shortening the Period of Mine Construction.

    优化施工组织设计减少次数,缩短建井工期。

    youdao

  • The reasonable term of mining rights value calculation was proposed which was equal to the sum of mining rights service time and basic construction period before mine commissioning.

    一定时间范围内,同宗采矿权期限越长,采矿权价值就越大

    youdao

  • The reasonable term of mining rights value calculation was proposed which was equal to the sum of mining rights service time and basic construction period before mine commissioning.

    一定时间范围内,同宗采矿权期限越长,采矿权价值就越大

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定