• The effective gas control and gas outburst prevention will influence seriously the schedule, safety, quality and cost of the engineering.

    施工中不能有效地治理瓦斯防治瓦斯突出工程进度安全质量造价等方面造成严重的不良后果。

    youdao

  • Based on the researches above, the detailed engineering measure and non-engineering measure for risk handling is designed to control construction-schedule risk of DS WKP effectively.

    在上述研究基础,制定了具体风险应对工程措施非工程措施,有效控制DS水闸枢纽工程进度风险。

    youdao

  • Construction project cost control is to the construction project all relevant project schedule, quality cost cost control, to ensure the construction engineering reasonable, smooth.

    建筑工程成本控制建筑工程一切有关工程进度质量花费成本进行控制,保证建筑工程合理顺畅的进行。

    youdao

  • Via a lot of work on the large datum, this paper studies schedule and cost's control index values of engineering project by way of different functions and structure types in Xi 'an.

    经过大量数据分析整理,研究西安市范围内几不同使用功能结构形式建设项目工期成本控制指标值

    youdao

  • Via a lot of work on the large datum, this paper studies schedule and cost's control index values of engineering project by way of different functions and structure types in Xi 'an.

    经过大量数据分析整理,研究西安市范围内几不同使用功能结构形式建设项目工期成本控制指标值