It is important to test the full round-trip operation, meaning from workflow initiation, through approval message routing and handling in Lotus Domino, to processing of an approval decision in SAP.
测试完整的操作流程非常重要,即从工作流发起开始,接着在Lotus Domino中发送和处理审批消息,然后再在SAP中处理审批决策。
Furthermore, it draws 178 watts in full power operation, whereas the dimmer test sample draws only 138 watts.
另外那台高海拔模式测试样机全功率模式工作下测得功率为17 8瓦,而初始亮度较低的样机仅测得13 8瓦。
The C-Design Assessment is valid for test operation comprising a maximum of 2 years or 4000 equivalent hours at full load.
设计评审对试运行(最大试运行时间为2年或满负荷情形下4000小时)有效。
应用推荐