It is important to test the full round-trip operation, meaning from workflow initiation, through approval message routing and handling in Lotus Domino, to processing of an approval decision in SAP.
测试完整的操作流程非常重要,即从工作流发起开始,接着在LotusDomino中发送和处理审批消息,然后再在SAP中处理审批决策。
Furthermore, it draws 178 watts in full power operation, whereas the dimmer test sample draws only 138 watts.
另外那台高海拔模式测试样机全功率模式工作下测得功率为17 8瓦,而初始亮度较低的样机仅测得13 8瓦。
The C-Design Assessment is valid for test operation comprising a maximum of 2 years or 4000 equivalent hours at full load.
设计评审对试运行(最大试运行时间为2年或满负荷情形下4000小时)有效。
Features: use computer operation system, micro computer control, full digitals set, has manual and automatic loading, can accurately test current, voltage, torque, power and efficiency and save.
特点:采用计算机操作系统,微电脑控制、全数字设定,有手动或自动加载。对电流、电压、转矩、功率、效率参数进行准确测试并打印、储存。
The C-Design Assessment is valid for test operation comprising a maximum of 2 years or 4000 equivalent hours at full load.
C设计评审对试运行(最大试运行时间为2年或满负荷情形下4000小时)有效。
The C-Design Assessment is valid for test operation comprising a maximum of 2 years or 4000 equivalent hours at full load.
C设计评审对试运行(最大试运行时间为2年或满负荷情形下4000小时)有效。
应用推荐