The secondstage is to close the left bankmainriverbed, divert the stream to the right bank open channel and build the spillway section in the mian river bed and the powerhouse on the left bank.
Officials said the spillway gates are likely to be open for weeks, and it will be weeks before the river falls below flood stage, allowing those who have evacuated to return safely.
Some of the spillway's gates will likely be open for weeks, and it'll be at least that long before the river falls safely below flood stage and those who have evacuated can safely return, said Col.