建筑工程项目进度管理中存在的问题及其对策--中国期刊网 关键词】工程进度控制;问题;对策 [gap=839]Key words】Engineering schedule control; Problems; Countermeasures
基于6个网页-相关网页
The effective gas control and gas outburst prevention will influence seriously the schedule, safety, quality and cost of the engineering.
在施工中不能有效地治理瓦斯、防治瓦斯突出将对工程的进度、安全、质量及造价等方面造成严重的不良后果。
Based on the researches above, the detailed engineering measure and non-engineering measure for risk handling is designed to control construction-schedule risk of DS WKP effectively.
在上述研究基础上,制定了具体的风险应对工程措施和非工程措施,有效控制了DS水闸枢纽工程进度风险。
Construction project cost control is to the construction project all relevant project schedule, quality cost cost control, to ensure the construction engineering reasonable, smooth.
建筑工程成本控制是对建筑工程一切有关工程进度、质量所花费成本进行控制,来保证建筑工程合理、顺畅的进行。
应用推荐