s blast furnace coal injection 高炉喷煤
blast furnace coal powder injection 高炉煤粉喷吹
blast furnace injection coal 高炉喷吹用煤
Combined with the project of the pulverized coal injection (PCI) automatic control system of 2200m~3 BF in AnGang Iron Making Factory, this thesis researches the design and development of blast furnace coal injection automatic control software system.
论文结合安钢炼铁厂2200m3高炉喷煤自动控制软件系统的开发项目,对高炉喷煤自动控制软件系统的设计和开发进行了研究。
参考来源 - 高炉喷煤自动控制软件的设计与实现·2,447,543篇论文数据,部分数据来源于NoteExpress
Some detail problems existing in sinter, blast furnace pulverized coal injection and BF operation were summarized, and some motheds solving problems were introduced.
对烧结、高炉喷煤及高炉操作过程中在某些细节上存在的问题进行了分析,并介绍了相应的解决方法。
Under high speed preheat in blast furnace and gasification in iron-bath for smelting reduction the pyrolysis of pulverized coal injection is the first important stage.
高炉喷吹煤粉和熔融还原铁浴粉煤气化等高速加热条件下,快速热分解是第一步。
The blast furnace raceway formation under the intensive coal injection by measurement of micro wave reflection gunned through a tuyere is discussed.
通过利用风口测量枪进行的微波反射测量方法讨论了大煤粉喷吹量条件下高炉风口回旋区的形成。
应用推荐