• The construction schedule was plagued by the bad weather.

    天气恶劣使工程进度受阻

    youdao

  • The construction schedule is only a plan, which always has risk.

    施工进度计划只是一个计划存在风险

    youdao

  • The construction schedule and methods of the latter system were put forward.

    提出了干挂石材墙面采用现浇聚氨酯保温隔热系统施工程序方法

    youdao

  • These meetings should include reviewing and updating the construction schedule and the cost estimates.

    这些会议应当包括回顾更新施工进度成本预算

    youdao

  • Other work must be centered on the construction schedule to adapt to the requirements of the arrangements.

    施工中的其他工作必须围绕着并适应施工进度计划要求安排。

    youdao

  • These projects were based around and driven by the construction schedule for the buildings, a very sequential process.

    这些项目工作建筑物施工进度驱动的,是一个非常有序过程

    youdao

  • This method has the obvious effect to ensure the construction safety, speed up the construction schedule and reduce the construction cost.

    方法确保施工安全加快施工进度降低施工成本方面具有显著效果

    youdao

  • The groundwater inflow into a tunnel affects not only the construction schedule, cost, stability and safety, but also the groundwater level.

    隧道不但影响施工进度、施工费用稳定安全会引起地下水位的下降。

    youdao

  • Therefore, in the management of modern construction projects, it is becoming an important work to control and manage the construction schedule.

    因此现代施工项目管理中,对工程进度控制管理成为一项极为重要工作

    youdao

  • Work out monthly progress plan and weekly progress plan to ensue the construction schedule in different construction stages to be completed on time.

    编制工程进度计划计划控制阶段工期如期完成。

    youdao

  • The functions and characters of the software P3 and its application to work out the construction schedule of a pumped storage power station are described.

    介绍P 3软件功能特点以及抽水蓄能电站工程施工进度计划编制中的应用过程及成果。

    youdao

  • In that case, ensuring the construction term of the construction schedule reasonably and impersonally would be the guarantee of the whole construction procedure.

    如何科学、客观确定施工进度计划中各分部、分项工程持续时间施工进度计划具有合理性和可行性的保证

    youdao

  • Template processes in many cases network diagram of the construction of the key lines, Process Improvement template can often speed up the construction schedule.

    模板工序许多情况下施工网络中的关键线路,模板工艺改进常常可以加快施工进度

    youdao

  • Understands from city live built bureau, on the premise of ensure the construction quality and safety, are accelerating the construction schedule of each link quality.

    了解到,确保施工质量安全前提下,施工方正在加速每个环节的工程进度

    youdao

  • In the construction of highway, the construction organization of through cut and the construction quality will influence the construction schedule and slope stability.

    公路建设路堑开挖施工组织是否合理、施工质量如何,影响施工进度边坡稳定

    youdao

  • In the construction process of the old people's home of Nansan, we seek after some methods to control the construction schedule better together with the construction unit.

    结合青岛市福彩南山养老院工程施工单位共同对如何做好进度控制工作进行了一些探索

    youdao

  • Abstract: Based on the construction schedule network planning, this paper puts forward the idea and draw steps of compositive horizontal line graph to construction schedule.

    [摘要]工程施工进度网络计划基础提出绘制施工进度计划综合思路绘制步骤

    youdao

  • Excavation scheme is determined accordingly, which can satisfy the requirement of operation of large machines, reduce the construction cost and ensure the construction schedule.

    方案满足大型机械施工条件大大提高效率,确保工期降低工程造价创造了条件。

    youdao

  • The implementation of transitional plan dramatically improves the construction efficiency, shortens the construction schedule and guarantees the quality and safety of construction.

    过渡方案实施缩短了施工工期确保了施工质量安全

    youdao

  • With careful monitoring, considering the accordance of the construction schedule and the loading speed, the reclaiming process is integrated with the treatment of soft soil in this case.

    工程特点在严密监测下,吹填进度速度一并考虑,围海造陆过程处理过程融为一体

    youdao

  • In light of the construction difficulty during building a long tunnel in soft rock mass, the 3d numerical simulation is used to analyze the construction schedule of the Changliangshan tunnel.

    针对长梁山隧道软弱围岩施工难题,采用数值模拟手段对施工过程进行计算分析

    youdao

  • He said the 10-month construction freeze will end on schedule on September 26th, according to a previous decision of the Israeli Cabinet.

    根据以色列内阁先前决定冻结定居点建设10个月的决定按计划9月26日结束

    youdao

  • Figure 10: Sample master schedule that has the overall Construction phase divided into three six-week periods, with important delivery dates at the end of each iteration.

    10每个迭代最后重要交付日期整个构建阶段分成三个六周周期的综合时间表进行采样

    youdao

  • The Augustine panel questioned the cost, design and construction schedule of the rocket in a report submitted to the White House for consideration.

    斯汀专项研究小组质疑提交给白宫考虑报告中的成本设计以及建设计划

    youdao

  • For example, the master single-tier schedule in Figure 10 has the overall Construction phase divided into three six-week periods.

    例如10单层综合图表将整个构建阶段分为三个六周周期

    youdao

  • Supervise, co-ordinate and schedule the activities of workers who operate cranes and construction, paving, drilling, railway maintenance and other similar heavy equipment.

    监督协调和统筹安排操作起重机施工摊铺钻井铁路维护其他类似重型设备工人活动

    youdao

  • In this paper author introduces the application of this article in road bidding, construction management, engineering schedule, engineering quality, engineering cost and contract management.

    着重论述条款公路投标施工组织工程进度、工程质量、工程费用、合同管理各个阶段中的应用

    youdao

  • Because of rain, construction on the subway system fell behind schedule.

    由于下雨,导致地铁工程进度落后

    youdao

  • The construction management plan to be optimized and executed to help the works completing on schedule with good quality and safety.

    优化施工组织设计组织实施以利工程能优质安全的前提下能如期完成

    youdao

  • The construction management plan to be optimized and executed to help the works completing on schedule with good quality and safety.

    优化施工组织设计组织实施以利工程能优质安全的前提下能如期完成

    youdao