The second stage is to close the left bank main river bed, divert the stream to the right bank open channel and build the spillway section in the mian river bed and the powerhouse on the left bank.
二期工程围左岸主河床 ,右岸明渠 (建于一期 )导流 ,建主河床泄洪坝段及左岸电站厂房。
The second stage is to close the left bank main river bed, divert the stream to the right bank open channel and build the spillway section in the mian river bed and the powerhouse on the left bank.
二期工程围左岸主河床 ,右岸明渠 (建于一期 )导流 ,建主河床泄洪坝段及左岸电站厂房。
应用推荐