• Engineers had spent days pumping heavy drilling fluid into the leaking well head on the ocean floor in a high-pressure bid to smother the gushing crude and ultimately seal the well with cement.

    工程师们数日来一直海底泄漏油井大量钻探泥浆,希望高压堵住喷涌原油,最后用水泥封死油井。

    youdao

  • Engineers had spent days pumping heavy drilling fluid into the leaking well head on the ocean floor in a high-pressure bid to smother the gushing crude and ultimately seal the well with cement.

    工程师们数日来一直海底泄漏油井大量钻探泥浆,希望高压堵住喷涌原油,最后用水泥封死油井。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定