• Based on the content analysis of assembly line planning, a method for assembly line planning based on standard work time and simulation is proposed, and a corresponding prototype system developed.

    分析装配线规划内容基础之上,提出了基于标准作业时间系统仿真装配线规划方法开发了相应原型系统

    youdao

  • Under the condition of vehicle general assembly line, standard time is divided into value-added and non-value-added time.

    轿车总装流水线条件,根据作业性质将标准工时划分增值时间非增值时间。

    youdao

  • Under the condition of vehicle general assembly line, standard time is divided into value-added and non-value-added time.

    轿车总装流水线条件,根据作业性质将标准工时划分增值时间非增值时间。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定