prestressed concrete rigid frame bridge 预应力混凝土连续刚构
The unsymmetrical construction loads is dangerous to the stability of long-span prestressed concrete rigid-frame bridge during cantilever construction phase.
非对称形式的施工荷载对悬臂施工阶段大跨径预应力混凝土刚构桥的稳定性更为不利。
To ensure the quality and security of the prestressed concrete continuous rigid frame bridge, construction control was of great importance.
为了保证大跨径连续刚构桥悬臂施工的质量和安全,施工控制是非常重要的。
The influence of concrete creep on bridge structure under the construction and operation stage for prestressed concrete continuous rigid frame bridge and cable-stayed bridge is also analyzed.
本文还针对预应力混凝土连续刚构桥和斜拉桥,分析计算了其在施工和运营阶段,混凝士徐变对桥梁结构的影响。
应用推荐