Then we had a misunderstanding on the Yoga mat » 然后我们在瑜伽垫上遇到了一场误会 pile driving machine » 桩驾驶机 Shedding tears, did not deceive themselves » 正在翻译,请等待..
基于1个网页-相关网页
The problem of crane overload protection of the hydraulic static pile driving machine is originally solved by a full hydraulic project through comparison and demonstration in advance in this paper.
本文针对这一实际工程问题在静力压桩机吊机过载机理分析的基础上,通过方案的比较论证,首创性地提出了液压静力压桩机吊机过载保护问题的全液压解决方案。
In 2000, pile-driving machine was first used in underwater construction in building Nanshi hydrologic station.
应用钻孔桩机建设澜石水文站自记台在水下施工。
应用推荐