It can be seen that the initial maximum pore water pressure takes place in the lower soil due to the load transformation from pile cap to soil.
研究结果表明,打桩后桩体所受荷载向下传递,地基中的初始最大孔隙水压力出现在桩端以下土层。
The partial low pile cap deep water foundations of Qinhong bridge are located in the flood discharge channel and near by existing civil bridge foundations in Nanjing.
南京市秦虹大桥的部分低桩承台深水基础位于泄洪河道中,并处于既有市政桥梁基础附近。
应用推荐