This request enterprise must carry on the standard to the construction item, manage scientifically, specially strengthens to the project quality, the progress, the cost, the safe supervisory control.
这就要求企业必须对施工项目进行规范、科学地管理,特别是加强对工程质量、进度、成本、安全的管理控制。
The paper introduces how to control the cost of construction works from item decision-making phase, design phase, tender phase, construction phase and settlement phase.
从项目决策阶段、设计阶段、招投标阶段、施工阶段,竣工结算阶段等几个方面对建设工程造价控制做了介绍。
The paper analyses the concept and the role of "four calculation", and compares item cost analysis of construction enterprise with general cost analysis.
介绍四算的概念、作用及项目施工企业成本分析与一般成本分析的比较。
应用推荐