This paper introduces the present method of numerical analysis and design model for structure calculation in underground construction. Then, these calculative methods were evaluated.
本文介绍了目前地下工程结构设计采用的计算模型及相关的数值分析方法,并对各计算方法进行了评价。
The activity diagram, use case diagram, sequence diagram, collaboration diagram and the class diagram are used for building the analysis and design model of the sedimentary facies modeling system.
系统中采用了活动图、 用例图、顺序图、交互图和类图建立沉积相建模系统的分析和设计模型。
In the sample implementation shown in Table 2, analysis model and design model filenames are specified as parameters.
在表2中显示的实现示例中,指定分析模型和设计模型的文件名作为参数。
应用推荐