The project engineer had the right to perform all actions, although closure was always left to the I&T team.
项目工程师也有执行所有动作的权限,虽然关闭动作总是由 I&T 团队执行的。
Don \ \ \ 't do that — do it right. Label all the cables (yes, both ends), and dress them nice and neat.
千万不要这样做,一定要按照正确的方式,给所有的线缆贴上标签(是的,所有的),并且把它们捆扎干净整齐。
Billy: All right, I won "t. Good luck with your quest."
比利:对,我不会那样的。祝你好运。
VOA: standard.other
I've thrown away most of the array- most of the list, I shouldn't say array- most of the list. All right?
我已经把数组的大部分都排除了-,列表的大部分-,我不应该说数组-列表的大部分?
All right? The first one is, that test has to involve-- shouldn't have to, the value of some variable.
好不好?第一件事是,循环开始的测试必须必须-不是一定,一些变量的值。
应用推荐