• 视频展示了工程变更情景下协作

    The presented scenario shows collaboration in the context of engineering change order.

    youdao

  • 负责工程变更执行跟踪

    Responsible for implement and track the process engineer change issues.

    youdao

  • 管理监督工程变更执行

    Manage and monitors implementation of Engineering Change.

    youdao

  • 建设项目建设过程中常会发生工程变更

    In the construction process, engineering changes often occur.

    youdao

  • 工程变更执行日期是否相关报告记录

    Is ECN implemented date being recorded in related report?

    youdao

  • 产品工程变更评估相应措施实施

    New product and ECN evaluation and relevant solution implement.

    youdao

  • 根据工程变更申请定义发布零件零件清单

    Defines and issues alterations of parts and part lists according to Engineering Change Requests.

    youdao

  • 继而提出加强公路建设项目工程变更管理控制策略

    And then strengthening the management of road construction projects engineering change control strategy is proposed.

    youdao

  • 笔者根据几项工程变更索赔经验索赔理由进行探讨。

    According to the several engineering change claim to claim experience is discussed in this paper.

    youdao

  • 一般由工程决定ecn,没有工程变更要求管理系统

    It is up to only Engineering to decide for ECN. No systematic ECR feedback.

    youdao

  • 批准所有技术变更(BCP内部),跟踪有时批准工程变更

    Approve all technical changes (BCP internal), Follow up and sometimes approve Engineering change.

    youdao

  • 介绍钻孔地质变化引起工程变更估价原则估价方法

    This paper introduces the appraisal principles and methods of engineering changes are caused by geologic changes in drilling hole pour pile.

    youdao

  • 低成本增强制造过程、不合格品工程变更管理无纸化报告;\ n ?

    Cost effectively enhance paperless reporting for manufacturing, nonconformances and Engineering Change management.

    youdao

  • 负责工程变更编号的发放与管理工程变更状态跟踪文件存档;

    Engineering change management. To register EC No. , track status and record the document.

    youdao

  • 工程变更索赔工程实施阶段风险管理工作中的重要内容。

    Project alteration and the claim for compensation are major questions in the risk management in project construction.

    youdao

  • 摘要工程建设过程中,由于各种原因工程变更情况时有发生

    Abstract: in the process of project construction, because all sorts of reasons, engineering change situation happen from time to tome.

    youdao

  • 工厂变更管理系统接收工程变更确认无误启动相应的变更流程。

    Receiving change information in plant change management system, initiate running change implementation process when all query identified.

    youdao

  • 工程变更管理动态管理过程过程控制关键在于建设单位

    Changing construction is a dynamic management process and the key point for project control is the constructor.

    youdao

  • 建立合理工程变更方案评价指标体系开展工程变更方案评价基础

    The project to establish a rational evaluation system of the construction change is the basis of the program evaluation of the construction change.

    youdao

  • 全权负责改进产品成本交付以及质量而进行工程变更建议实施

    Overall responsible for recommends and implements changes to product or process which would improve cost, delivery and quality to the customer.

    youdao

  • 施工期间出现工程变更,则工程变更通知单要符合合同中的单价比率规定。

    If there is a change order during the construction period, the change order shall adopt the unit rate price of the contract.

    youdao

  • 本文对如何应用FIDIC施工合同条件条款处理工程变更进行了简要介绍

    The construction contract FIDIC conditions of the application of the provisions dealing with changes in the project briefing.

    youdao

  • Fabric提供一个业务流程工程变更阶段指定选定工程变更请求(ECRs)。

    Fabric provides a business process for specifying and deciding on engineering change requests (ECRs) at the engineering change phase.

    youdao

  • 确保成本数据的更新包含最新工程变更制造过程定义经济个体假设变化

    Ensure cost data up to date with most recent engineering changes, manufacturing process definition, or economics assumption changes.

    youdao

  • 编制评估承包商投标书的文件,并提供其它工程变更通知施工投标书相关的服务

    Preparing documents evaluating Contractor's proposals, a nd providing other services in connection with Change Orders or Construction proposals.

    youdao

  • 进行产品BOM(物料清单)表建立维护,根据工程变更相关部门要求进行更新

    Built and maintain BOM (bill of material) for new product and update it in case of engineering change or other requirement by related dept.

    youdao

  • 工程变更就是合同变更,是合同中的工作内容作出修改或者追加或取消某项工作。

    The engineering modification is also the contract modification, which means that some modification, superaddition or canceling is done in content of contract.

    youdao

  • 通过高速公路工程变更原因进行分析,提出了一些控制高速公路工程变更对策、措施。

    The paper explains the cause of expressway engineering change, and presents the measures to control the expressway engineering change.

    youdao

  • 通过高速公路工程变更原因进行分析,提出了一些控制高速公路工程变更对策、措施。

    The paper explains the cause of expressway engineering change, and presents the measures to control the expressway engineering change.

    youdao