• In unpacking, the shipping list must be first examined to ensure the proper configuration of the required system.

    过程中,必须检查运输清单保证系统必须构件齐全。

    youdao

  • Porosity of fluidizing plates is rigidly controlled. Plates are closely inspected prior to assembly and all tanks are checked for proper fluidization before shipping.

    孔隙率受到严格控制化板组装之前已进行详细检查并且发货之前所有箱体会进行适合的流化检查。

    youdao

  • Porosity of fluidizing plates is rigidly controlled. Plates are closely inspected prior to assembly and all tanks are checked for proper fluidization before shipping.

    孔隙率受到严格控制化板组装之前已进行详细检查并且发货之前所有箱体会进行适合的流化检查。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定