• Methods for realizing project schedule control using the "earned value evaluation principle" were specially analyzed.

    重点分析了运用赢得评估原理实现工程项目进度控制方法

    youdao

  • The WAPI project schedule control is based on critical chain project management. The core is the management and controlling of buffer.

    WAPI项目进度控制基于关键管理的进度控制,核心缓冲管理控制

    youdao

  • Present international conventional "earned value evaluation principle" as well as how to combine the earned value with project schedule control and cost control organically were also expounded.

    阐述当前国际通用赢得评估原理以及如何赢得值项目进度控制费用控制有机地联系起来

    youdao

  • After the basics of managing the schedule, managing scope is the most important activity required to control a project.

    做完计划管理基础工作后,范围管理成为控制项目最为重要活动

    youdao

  • Quality initiatives must lead cost and schedule in the control of the project to satisfy the spirit of the CMM.

    质量活动必须使成本进度处于项目控制之下,满足CMM精神

    youdao

  • Meanwhile it also studied the feasible tools and methods used in project plan and schedule control, such as SWOT analysis, SWART principle, WBS etc.

    同时,对项目计划进度控制过程使用的具体方法进行了研究,诸如swot分析SWART原则WBS分解等。

    youdao

  • It is crucial for successful project management and schedule control to have a scientific and efficient project execution plan.

    制定套科学高效项目实施计划并按计划进行进度控制成功实施项目管理,使工程按期投产的主要因素。

    youdao

  • On the basis of that, the aviation model development project management schedule control framework was proposed.

    基础上提出航空型号研制项目管理进度控制模型

    youdao

  • The paper puts forward some ideas on project management and design schedule control in modern office environment.

    文中现代办公环境下项目管理设计进度控制工作提出一些想法,供商榷。

    youdao

  • However, owing to the outdated project management system and nonstandard architectural market, there exist some problems such as schedule control, operation management and bidding, etc.

    由于当时水利工程管理体制落后建筑市场不规范,在进度控制运行管理、招投标等方面存在一些问题

    youdao

  • Construction of the project implementation, to develop specific programs and projects in the implementation process on the installation schedule and make adjustments to control.

    项目实施制定具体施工方案项目执行过程中安装进度计划进行调整、控制。

    youdao

  • Construction of the project implementation, to develop specific programs and project implementation process on the installation schedule and make adjustments to control.

    项目实施制定具体施工方案项目执行过程中安装进度计划进行调整、控制。

    youdao

  • The installation quality of the air-cooling island, which is a turn-key project of Shenmu Yangguang Power Plant, is very important, and its schedule control is also very complicated.

    陕西神木阳光电厂工程安装质量控制主要保证焊缝施工质量风机找平对中的质量,进度控制就是确保施工节点不变。

    youdao

  • Plan and schedule control, cost control, quality control and safety control are important parts of project management.

    计划进度控制成本控制、质量控制安全控制工程项目管理重要组成部分

    youdao

  • Then it also discusses the general process of schedule control, which including three steps, action preparing, process monitoring and controlling, project results evaluation.

    然后讨论项目进度控制一般过程包括准备行动程序、过程监测控制以及最后项目评估三个阶段并对进行分析。

    youdao

  • Site schedule control is an important link of whole project control, and platform fabrication is a critical activity of Pinghu oil and gas field development project.

    报告。平湖油气田工程现场进度控制整个项目控制过程中的重要环节平台建造是整个平湖油气田项目的关键活动之一。

    youdao

  • By using a real case of an offshore oil project as example, this paper presents the method and approach utilized in the process of framework planning and design stage for schedule control.

    海洋石油工程项目进度控制管理阐述设计阶段网络计划编制、设计过程进度控制方法手段

    youdao

  • Based on the characteristics of Aviation products, this paper mainly focus on the research of schedule control technology in the process of project running.

    本文针对航空产品特点项目运行过程进度控制技术进行研究

    youdao

  • The intention of the project management is to schedule, organize and control all activities to achieve the project goal eventually. No matter how difficult it is and what kind risks are there.

    项目管理目的计划组织控制所有活动达到困难重重极具风险情况下仍能成功而顺利地完成一个项目目标

    youdao

  • Via a lot of work on the large datum, this paper studies schedule and cost's control index values of engineering project by way of different functions and structure types in Xi 'an.

    经过大量数据分析整理,研究西安市范围内几不同使用功能结构形式建设项目工期成本控制指标值

    youdao

  • By analyzing the difference of the actual schedule and plan, combined to the actual cases, found the schedule control methods which fit for the characteristics of this project.

    通过分析专业实际进度专业计划进度差距结合实际找到适合项目特点进度控制方法

    youdao

  • The Xiaolangdi water control project is constructed in smooth progress with its major items all along keeping in advance of the contractual schedule.

    小浪底水利枢纽大坝工程施工进度进展顺利各主要项目一直超前合同目标计划。

    youdao

  • Project earned value management is the most effective co-ordinate control methods of cost and schedule by far, but our research on the earned value management is still very limited.

    项目管理迄今为止最有成效一种进度费用协调控制方法然而我国挣值管理研究有限。

    youdao

  • ABSTRACT: This paper introduced the progress control process of initial energization in AP1000 Sanmen Project, and provided the analysis direct at schedule variance appeared.

    摘要介绍ap1000三门项目首次送电整体进度控制过程针对现场执行过程中执行计划与基准计划的偏差进行分析

    youdao

  • The case study indicates that the method proposed in this article can effectively plan and control project cost and schedule objectives.

    实例研究表明本文提出方法更好地计划控制项目费用进度目标

    youdao

  • But the important means to achieve these two objectives at the same time is the Earned Value Method which is mean of project cost and schedule co-ordinate control.

    同时实现两个目标重要手段就是通过工程项目费用进度进行协调控制。

    youdao

  • Particularly, this thesis has given in-depth discussion about implementation procedure of project management and schedule (or quality or cost) control with matrix management.

    论文特别项目管理实施程序矩阵式管理过程中如何实施进度质量、费用等控制进行较深入探讨

    youdao

  • Particularly, this thesis has given in-depth discussion about implementation procedure of project management and schedule (or quality or cost) control with matrix management.

    论文特别项目管理实施程序矩阵式管理过程中如何实施进度质量、费用等控制进行较深入探讨

    youdao