The construction condition, technology and procedure for steel pipe concrete pile supported by anchor foundation at the north, Renyang Bridge and the quality detection are introduced in the paper.
简要介绍润扬大桥北锚碇基础支撑钢管混凝土桩的施工条件、施工工艺和施工过程以及质量检测。
The construction condition, technology and procedure for steel pipe concrete pile supported by anchor foundation at the north, Renyang Bridge and the quality detection are introduced in the paper.
简要介绍润扬大桥北锚碇基础支撑钢管混凝土桩的施工条件、施工工艺和施工过程以及质量检测。
应用推荐