• Earth dam consists of shallow sand and is located between the plant and the overflow dam. It is 2800 meters long and 600 meters wide.

    土坝沙筑成2800600米,位于电厂溢流之间

    youdao

  • The method of shallow layer seismic image is used to test a reinforced concrete dam and the test results are comprehensively analyzed.

    钢筋混凝土大坝采用浅层地震映像检测实例结果进行了综合分析。

    youdao

  • The observation result of vibration is rational either in middle shallow blasting or in rock excavation near the dam.

    不论是中部孔爆破还是大坝近岩体开挖其振动观测结果总体合理。

    youdao

  • The observation result of vibration is rational either in middle shallow blasting or in rock excavation near the dam.

    不论是中部孔爆破还是大坝近岩体开挖其振动观测结果总体合理。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定