Defines and tracks project plan and work breakdown structure.
定义并追踪项目计划与工作分解结构。
Figure 17 shows a typical Timesheet view that displays work assignments by project, the work breakdown structure and corresponding data for each task assignment.
图17显示了一个典型的工时单视图,展示了计划好的工作分配情况、工作分解结构和每个任务分派相应的数据。
When RUP project planning work is underway, it is desirable to introduce an easily navigable structure for linking artifacts.
当RUP项目计划工作正在进行的时候,需要为连接工件引入一个容易操作的结构。
Finally, as the software architect works closely with the project manager, the structure of the architecture is used to assign work to teams.
最后,当软件架构师与项目管理人员紧密地协同工作时,将根据体系结构的结构为不同的团队分配相应的工作。
A work breakdown structure (WBS) is the best way to understand the detailed work of a project when you have to build a schedule from scratch.
当你需要从草稿中拟定出日程表时,工作分解结构(WBS)是理解项目工作细节的最好方式。
The "Copy project" command copies the structure of the project, such as the role definitions, phases and iterations, and work configurations.
“复制项目”命令复制项目的结构,例如,角色定义,阶段和迭代,工作配置。
All in all, a stream strategy that is well defined, managed, and enforced gives project leaders a structure to manage work targeted for a release.
总之,一个流策略一旦被很好地定义,管理以及加强,就会为这个项目领导者提供一个构架为某次发布而管理工作。
These may be within the context of a particular project, proposal or work breakdown structure element.
这些可能在一个特定项目、提议或工作分解结构元素的上下文环境中。
Drafting a work breakdown structure (WBS) as the basis for a project schedule.
草拟以项目计划为基础的工作故障结构(WBS)。
Brendan Lang, 30, was a project manager for Structure Tone, and was doing work at the WorldTrade Center on Sept. 11.
布兰登·朗,30岁,生前是StructureTone的一名项目经理,事发当天正在世贸中心工作。
A work breakdown structure (WBS) is used on every project.
工作分解结构(WBS)用于每个项目中。
This paper analytical the pumps type and characteristics, put forward the best project according to pump station work property, structure, set number of water pump.
文章通过对水泵的类型及特点的比较分析,提出应根据泵站工作性质对水泵的类型、结构、台数进行综合考虑选出最佳方案。
Franklin's break came when she was hired by King's College in 1950 to work on the DNA project as a crystallographer—mapping the location of atoms within a structure.
1950年,富兰克林的机会来了,国王学院聘用她作为晶体绘制员参加DNA项目研究——她负责绘制一个结构内原子的位置图。
Then, the WBS structure of aviation project is researched. The parameter calculating, the method of resource estimating, and responsibility assign matrix of the work package is provided.
研究了航空型号项目的WBS结构,工作包的参数计算、资源估算和工作责任矩阵;
Via a lot of work on the large datum, this paper studies schedule and cost's control index values of engineering project by way of different functions and structure types in Xi 'an.
经过对大量数据的分析整理,研究西安市范围内几类不同使用功能、结构形式建设项目的工期与成本控制指标值。
In M1 we have develop a Work Breakdown Structure and Product Breakdown Structure for a project.
在M1我们开发一个工作分解结构和产品项目分解结构。
You are a project manager for a new product development project that has four levels in the work breakdown structure, and has been sequenced using the arrow diagramming technique.
你是一个新产品开发项目的项目经理,这个项目的工作分解结构有四个层次,并按顺序使用箭线图技术。
The general notes herein are for steel structure work of This Project, and foundation and reinforced concrete work see concrete structure Design notes.
本说明为本工程钢构部分说明,基础及钢筋混凝土部分详见混凝土结构设计说明。
Introducing the concept of WBS (Work Breakdown Structure) into the project quotation software will greatly improve the accuracy of project cost estimation and the efficiency of cost control.
将项目管理中的WBS(工作分解结构)概念引入到工程报价软件中,将大大提高工程造价计价的准确性和造价控制的效率。
Project Management; Network scheduling; work Breakdown Structure; Pull Plan.
项目管理;网络计划;任务结构分解;拉动计划。
See also work package, control account, contract work breakdown structure, and project summary work breakdown structure.
另外请见工作细目、控制帐目、合同工作分解结构和项目概括性工作分解结构。
See also work package, control account, contract work breakdown structure, and project summary work breakdown structure.
另外请见工作细目、控制帐目、合同工作分解结构和项目概括性工作分解结构。
应用推荐