By using a complete engineering example, this paper gives the data of static load test and the data of settlement observation of treated single pile and single pile complex foundation respectively.
文章介绍了一个完整的工程实例,并给出了处理后的单桩和单桩复合地基静载荷试验数据和沉降观测数据。
In view of treatment and application of bored concrete pile in weak and complex foundation, combining concrete examples design and construction of bored concrete pile are introduced.
针对混凝土灌注桩对软弱复杂地基的处理及应用,结合具体实例介绍了混凝土灌注桩施工方法的设计与施工过程。
The shortage of bearing capacity is often encountered in pile foundation construction in complex schist area.
复杂片岩地区的桩基工程常出现桩基承载力不足的问题。
From the analysis of the engineering peculiarity of the salty soil, the working principle of the method of the complex foundation of dry jet mixing pile combined with geogrid is studied.
从分析盐渍土的工程特性入手,探讨桩-网复合基础处理盐渍土地基方法及其作用机理。
Pile foundation in the dock structure project has a complex stress character, which is a typical passive pile-soil interaction problem.
岸坡码头中高承台桩基,其受力特点复杂,是一个典型的被动桩与岸坡相互作用问题。
The aquatic pile foundation measurement is more complex than the land foundation measurement because the aquatic pile foundation can not be pre-calibrated in the field.
而水上桩基工程相对陆上桩基工程而言,由于其桩中坐标一般无法预先在实地标定,故其测量定位过程相对复杂。
The influence of test time on test result of gravel pile is analyzed during highway foundation improvement with complex geological condition.
该文讨论了在地质条件相对复杂的高速公路软基处理中,碎石桩检测时间对效果检测结果的影响。
The influence of test time on test result of gravel pile is analyzed during highway foundation improvement with complex geological condition.
该文讨论了在地质条件相对复杂的高速公路软基处理中,碎石桩检测时间对效果检测结果的影响。