The Paper bears on the problems appearing before and after the Prism hydrogen recovery set of large ammonia plant was put into operation and deals with the solving measures.
介绍大型氨厂普里森氢回收装置投运前后存在的问题及对策;
In Jinxi Large fertilizer plant, through technical modification and operation optimization, restart up procedure of ammonia plant is speeded up.
介绍锦西大化肥装置通过技术改造、优化操作,加快合成氨装置恢复开车速度,缩短开车时间的经验。
To solve the problem of pipes vibration of large-sized compressor in ammonia plant, orifice plates are installed after thorough analysis of the causes of vibration, effectively solved the problem.
针对合成氨系统的大型压缩机组管系振动问题,深入分析了原因后,采取在管道中加装节流孔板的措施,使管系振动得到了有效控制。
The process to replace the catalyst of shifting furnace was introduced for large-sized ammonia synthesis plant; the requirements of type selection and filling method for catalyst were discussed.
介绍了大型合成氨厂低变炉更换催化剂的过程;论述了催化剂的选型要求和装填方法;阐明了催化剂还原过程中从还原前升温到还原初期、主期及末期的操作步骤和要求。
The model is trained with the operation data of a large scale ammonia plant. The results calculated by this model agree well with industrial operation data.
该模型是以BP网络为基础的多层网络,用实际操作数据对该模型进行了训练,获得了较好的过程模拟效果,该模型可用于大型氨厂转化系统操作分析。
The process to replace the catalyst of shifting furnace was introduced for large-sized ammonia synthesis plant;
介绍了大型合成氨厂低变炉更换催化剂的过程; 论述了催化剂的选型要求和装填方法;
The process to replace the catalyst of shifting furnace was introduced for large-sized ammonia synthesis plant;
介绍了大型合成氨厂低变炉更换催化剂的过程; 论述了催化剂的选型要求和装填方法;