• This request enterprise must carry on the standard to the construction item, manage scientifically, specially strengthens to the project quality, the progress, the cost, the safe supervisory control.

    就要求企业必须施工项目进行规范科学地管理特别是加强工程质量进度成本安全管理控制

    youdao

  • According to the standard of ISO9000, the paper analyses the four item contents of quality and cost, and reaches importance and feasibility of quality and cost management for construction enterprise.

    iso 9000系列标准入手分析了构成质量成本内容得出了质量成本管理施工企业的重要性可行性

    youdao

  • The paper introduces how to control the cost of construction works from item decision-making phase, design phase, tender phase, construction phase and settlement phase.

    项目决策阶段设计阶段、招投标阶段、施工阶段,竣工结算阶段等几个方面对建设工程造价控制了介绍

    youdao

  • The paper analyses the concept and the role of "four calculation", and compares item cost analysis of construction enterprise with general cost analysis.

    介绍概念作用项目施工企业成本分析一般成本分析的比较

    youdao

  • The work expects the progress to the construction item, quality and cost to have the influence of different degree.

    工期建设项目进度质量成本有着不同程度影响

    youdao

  • We must build standard construction markets, practice public bidding and legal responsibility for item legal person; thus striving to achieve cost control target.

    必须狠抓有形建筑市场规范化建设积极推行公开招标投标制项目法人责任制才能实现造价控制的目标。

    youdao

  • The fix on step item cost in quoted price to bill quantity of construction, that is compete content of building items bid quoted price.

    工程量清单报价中的措施项目确定建设工程项目投标报价竞争内容

    youdao

  • The control of engineering cost of construction item is a complex system engineering that penetrates the whole process of construction.

    建设项目工程造价控制一个贯穿项目建设全过程复杂系统工程。

    youdao

  • But the core is the item cost controlling. The article discusses the building construction items cost controlling's principle and efficient approaches.

    核心项目成本控制本文施工项目成本控制原则有效途径进行了探讨

    youdao

  • And combined with the content of this change order, analysis item by item, to solve the problems summarized of second part. (4) the analysis of cost of construction project change.

    结合工程洽商变更内容逐项分析解决第二归纳出来问题。(4)建筑工程洽商变更计价分析。

    youdao

  • Third based on the sub-item resilience detailed list's construction cost management, proposed the construction cost change originates recognition methods.

    然后提出基于分项工程量清单造价管理体系造价变更来源的识别方法;

    youdao

  • Third based on the sub-item resilience detailed list's construction cost management, proposed the construction cost change originates recognition methods.

    然后提出基于分项工程量清单造价管理体系造价变更来源的识别方法;

    youdao