Any such delegation shall be effected in accordance with sub-clause 2. 4 and for this purpose such independent inspector shall be considered as an assistant of the Engineer.
这种委托应按第2.4分项条款办理,这种检验员应作为工程师的一个助手。这种任命通知书由工程师至少于14天前发给承包人。
Any such delegation shall be effected in accordance with sub-clause 2. 4 and for this purpose such independent inspector shall be considered as an assistant of the Engineer.
这种委托应按第2.4分项条款办理,这种检验员应作为工程师的一个助手。这种任命通知书由工程师至少于14天前发给承包人。
应用推荐