• For the frozen weathered bedrock, sandy gravel and pebble bed, it is more suitable to use drilling and blasting method than to use the frozen soil excavator.

    冻结风化基岩砂砾卵石层,冻土挖掘机效率低,采用爆破法,采用抓岩机装载冻土。

    youdao

  • Frozen city line depth is 0.8 meters, for the sandy clay soil, the main road width of 40 metres, are laying asphalt.

    城市冰冻线深度0.8土壤粘土主要马路40由柏油铺设。

    youdao

  • Frozen city line depth is 0.8 meters, for the sandy clay soil, the main road width of 40 metres, are laying asphalt.

    城市冰冻线深度0.8土壤粘土主要马路40由柏油铺设。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定