The presented computation methods are also applicable to stability analysis of catch drain, impended wall, open caisson and other excavation works during construction.
所述计算原则和方法也适用于分析截水槽、倒挂井、沉井及其他土石开挖工程在施工期的稳定性。
For extra reassurance, the gutters catch excess water and drain it away through the sewage system.
另外还保证排水槽可以保存过量的水并且通过排水系统排出。
Put a bucket under the hole in the drain pipe to catch any overflow.
在排水管的那个洞下放个水桶接住漏出的水。
There were three minnows in the pool which was too large to drain; and after several ineffectual attempts to catch them in the tin bucket he forbore.
池子里有三条鲦鱼,但是池太大,不可能舀干;徒劳无益地尝试了几次用铁罐子捉鱼后他克制住了自己。
There were three minnows in the pool which was too large to drain; and after several ineffectual attempts to catch them in the tin bucket he forbore.
池子里有三条鲦鱼,但是池太大,不可能舀干;徒劳无益地尝试了几次用铁罐子捉鱼后他克制住了自己。
应用推荐