• Center drift first construction method was adopted in Wushan main tunnel of Fuzhou 961 Civil Air Defence Work, and ground surface deformation was well controlled.

    福州961人防工程乌山主通道工程施工中采用中洞先行施工方法地控制了地表变形,保证了地表建筑物的正常使用。